Archives of Civil Engineering | 2019 | Vol. 65 | No 2

Download PDF Download RIS Download Bibtex

Abstract

The growth in high-rise building construction has increased the need for hybrid reinforced concrete and steel structural systems. Columns in buildings are the most important elements because of their seismic resistance. Reinforced concrete (RC) columns and steel columns were used herein to form hybrid structural systems combining their distinct advantages. Eleven 3D building models subjected to earthquake excitation with reinforced concrete beams and slabs of 12 floors in height and with different distributions of mixed columns were analyzed by the SAP2000 software in order to investigate the most suitable distributions of a combination of reinforced concrete and steel columns. Top displacements and accelerations, base normal forces, base shear forces, and base bending moments were computed to evaluate the selected hybrid structural systems. The findings are helpful in evaluating the efficiency of the examined hybrid high-rise buildings in resisting earthquakes.

Go to article

Authors and Affiliations

D.P.N. Kontoni
A.A. Farghaly
Download PDF Download RIS Download Bibtex

Abstract

The main objective of the article is to present quantified and measurable risks likelihood appearance, impact and significance of inspected and monitored 48 commercial construction projects and their feasibility to be carried out. Original technical, financial and organisational feasibility studies in compliance with a rigorous Bank Investment Supervision requirements have been executed by the author in the period of 2005–2018. Methodology of construction project appraisal for financing and execution professional preparation have been laid out – technical documentation, arrangements, realisation. Analysis and assessment of Bank Investment Supervision consisted of project execution plan PEP, geotechnical and environmental conditions, permit design, agreements and decision impacts of local authorities, engineering contract for construction works, project insurance and performance bonds, schedule of execution tasks and their costs, payment plan, investment budget and project economical effectiveness, scope of monthly construction works execution assessed by Earned Value Method approach and handover procedure of construction project. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented. Finally, risks likelihood appearance, impact and significance variability of commercial construction projects within last two years of booming investment industry have been determined.

Go to article

Authors and Affiliations

J. Konior
Download PDF Download RIS Download Bibtex

Abstract

Experimental tests were carried out to assess the failure model of steel and basalt fiber reinforced concrete two-span beams. Experimental research was focused on observing the changes in behavior of tested elements in dependence on the ratio of shear reinforcement and type of fiber. The beams had varied stirrup spacing. The steel fiber content was 78.5 kg/m3 (1.0% by vol.) and basalt fiber content was 5.0 kg/m3 (0.19% by vol.). Concrete beams without fibers were also examined. Two-span beams with a cross-section of 120×300 mm and a length of 4150 mm were loaded in a five-point bending test. Shear or flexural capacity of tested members was recorded. The effectiveness of both sorts of fibers as shear reinforcement was assessed and the differences were discussed. It was shown that fibers control the cracking process and the values of deflections and strains. Fibers clearly enhance the shear capacity of reinforced concrete beams.

Go to article

Authors and Affiliations

J. Krassowska
M. Kosior-Kazberuk
Download PDF Download RIS Download Bibtex

Abstract

This paper presents the results of the static work analysis of laminated veneer lumber (LVL) beams strengthened with carbon fabric sheets (CFRP). Tested specimens were 45mm wide, 100 mm high, and 1700 mm long. Two types of strengthening arrangements were assumed as follows: 1. One layer of sheet bonded to the bottom face; 2. U-shape half-wrapped reinforcement; both sides wrapped to half of the height of the cross-section. The reinforcement ratios were 0.22% and 0.72%, respectively. In both cases, the FRP reinforcement was bonded along the entire span of the element by means of epoxy resin. The reinforcement of the elements resulted in an increase in the bending strength by 30% and 35%, respectively, as well as an increase in the global modulus of elasticity in bending greater than 20% for both configurations (in comparison to the reference elements).

Go to article

Authors and Affiliations

M. Bakalarz
P.G. Kossakowski
Download PDF Download RIS Download Bibtex

Abstract

A “rock bridge”, defined as the closest distance between two joints in a rock mass, is an important feature affecting the jointed rock mass strength. Artificial jointed rock specimens with two parallel joint fractures were tested under uniaxial compression and numerical simulations were carried out to study the effects of the inclination of the rock bridge, the dip angle of the joint, rock bridge length, and the length of joints on the strength of the jointed rock mass. Research results show: (1) When the length of the joint fracture, the length of the rock bridge, and the inclination of the rock bridge stay unchanged, the uniaxial compressive strength of the specimen gradually increases as the inclination of the joint fracture increases from 0° to 90°. (2) When the length of the joint fracture, the length of the rock bridge, and the inclination of the joint fracture stay unchanged, the uniaxial compressive strength of the specimen shows variations in trends with the inclination of the rock bridge increasing from 30° to 150° (3). In the case when the joint is angled from the vertical loading direction, when the dip angle of the joint fracture, the inclination of the rock bridge, and the length of the rock bridge stay unchanged, the uniaxial compressive strength of the specimen gradually decreases with an increasing length of joint fracture. When the dip angle of the joint fracture, the inclination of the rock bridge, and the length of the joint fracture stay unchanged, the uniaxial compressive strength of the specimen does not show a clear trend with an increase of the length of the rock bridge.

Go to article

Authors and Affiliations

L.X. Xiong
H.Y. Yuan
Y. Zhang
K.F. Zhang
J.B. Li
Download PDF Download RIS Download Bibtex

Abstract

Accordingly to recommendations set out by standards, degradation curves which will serve as a tool facilitating decision-making regarding renovation works ought to be developed. The article presents the proposal of a model for predicting the aging of a residential building. The proposed PRRD (Prediction of Reliability According to Rayleigh Distribution) model determines the performance characteristics of a building over the full period of its use. PRRD accounts for the life spans of individual building components. Additionally introduced in the model were supplements accounting for the intensity of changes in the building and its surroundings. The developed method of the non-linear degradation process of a building accounts for the role and weights of individual building components as well as the intensity of significant factors influencing the aging process. The presented methodology of the description of changes in the performance characteristics over the course of using a building will be a diagnostic process of predicting the technical state of a building. The proposed predictions can serve as the basis for making the right strategic decisions when planning renovation works in residential buildings.

Go to article

Authors and Affiliations

B. Nowogońska
Download PDF Download RIS Download Bibtex

Abstract

Small construction objects are often built by standard task teams. The problem is, how to allocate these teams to individual works? To solve the problem of allocation three methods have been developed. The first method allows to designate optimal allocation of teams to the individual works in deterministic conditions of implementation. As a criterion of the optimal allocation can be applied: “the minimization of time” or “the minimization of costs” of works execution. The second method has been developed analogously for both criteria but for stochastic conditions and for the stochastic data. The third method allows to appoint a compromise allocation of teams. In this case, the criteria “the minimization of time” and “the minimization of costs” are considered simultaneously. The method can be applied in deterministic or stochastic conditions of works implementation. The solutions of the allocation problems which have been described allow to designate the optimal allocation of task teams and to determine the schedule and cost of works execution.

Go to article

Authors and Affiliations

T. Kasprowicz
Download PDF Download RIS Download Bibtex

Abstract

Construction projects, even exemplarily planned and organized, bear a risk of unforeseen events and problems which can result in completion of the works after the deadline, that is delays. The construction of bridges is an inseparable part of road and rail projects and construction and expansion of the transport network. The paper aims at finding a relationship between the independent variables characterizing bridge projects and the delays during their implementation. Two alternative models were proposed to solve the problem: logit and probit. The data set comprising road and rail bridges built in Poland in the last 12 years (2005–2017) was used to build the models. The evaluation, quality and accuracy parameters of proposed models were determined in the final part of the paper.

Go to article

Authors and Affiliations

A. Leśniak
M. Juszczyk
G. Piskorz
Download PDF Download RIS Download Bibtex

Abstract

The article presents the results of research, the aim of which was to determine the qualitative and quantitative structure of the causes of accidents that were a result of falling from scaffolding. An original methodology for the classification of accidents with regards to their causes was developed and was based on cluster analysis. An example of using the proposed methodology is provided. 187 post-accident protocols of occupational accidents involving construction scaffolding, which occurred between 2010 and 2017 in selected Polish voivodeships, were analyzed. Afterwards, the matrix of accident causes, for which the calculations were made, was created. Five subsets of accidents were obtained and the accidents were classified to a subset with similar causes.

Go to article

Authors and Affiliations

T. Nowobilski
B. Hoła
Download PDF Download RIS Download Bibtex

Abstract

Construction projects are characterised by complexity in the technical, organisational and environmental sphere. The organisational complexity of such projects makes it necessary to manage relationships between actors who fulfil various functions. Formal organisational structures that have been developed for this purpose do not always reflect the actual relationships between construction project participants. In literature, scholars more and more often point to the need to identify and monitor such informal relationships and attempt to manage them in order to effectively carry out projects. Structural analysis of so-called self-organising networks of relationships between project participants is carried out on the basis of established structural measures by performing Social Network Analysis (SNA). In a situation when inappropriate communication between project participants relative to management staff expectations is detected, interventions meant to improve communication in such networks are possible. The goal of the article is proposing an optimisation-oriented approach to planning such interventions while taking various constraints, such as communication costs, into consideration. As a part of this optimisation, the authors proposed a method from the heuristic methods group. This solution will support decision-making in terms of intervening within an informal relationship structure. The method was presented on the example of an actual construction project involving the construction of a complex of housing buildings. the self-organising network structure was defined on the basis of a survey carried out among the project's participants and concerned communication between them over a four-week period. As a result of the structural network analysis, abnormalities in communication between project participants were detected. The optimisation method developed by the authors pointed to possibilities of improving communication effectiveness within this network. The effects of the analysis confirmed the application potential of the method that was presented.

Go to article

Authors and Affiliations

E. Radziszewska-Zielina
G. Śladowski
E. Kania
B. Sroka
B. Szewczyk
Download PDF Download RIS Download Bibtex

Abstract

The diaphragm wall and the open caisson represent two main competitive technologies used in the construction of underground objects. In modern times, diaphragm walls are primarily applied for large-size objects, with open caissons being preferred in the case of small-sized ones. Currently, objects of this type are designed mainly for sewage treatment plants and detention reservoirs. Their construction involves highly labour-intensive processes. During the execution of works unforeseen negative effects are observed to occur. During the underground objects construction the most common phenomena are: deviations from the vertical (tilt), sagging, sinking below the designed level, cracking, scratches or leakage through the wall. The purpose of the paper is to classify undesired risk factors emerging in the process of underground objects construction and selection of the optimal technological and material solution for municipal facilities. The implementation of this task involved the selection of Multi-Criteria Decision Making methods, taking into account the cause-effect rating, as the mathematical apparatus. The Ratio Estimation in Magnitudes or deciBells to Rate Alternatives which are Non-DominaTed (REMBRANDT) method was applied. The research proved that it is possible to analytically assess unforeseen risk factors conducive to emergency situations during the implementation of underground objects, using the REMBRANDT method.

Go to article

Authors and Affiliations

R. Dachowski
K. Gałek
Download PDF Download RIS Download Bibtex

Abstract

The model for estimating the whole life costs of the building life cycle that allows the quantification of the risk addition lets the investor to compare buildings at the initial stage of planning a construction project in terms of the following economic criteria: life cycle costs (LCC), whole life costs (WLC), life cycle equivalent annual costs (LCEAC) and cost addition for risk (ΔRLCC). The subsequent stages of the model development have been described in numerous publications of the authors, while the aim of this paper is to check the accuracy of the model in the case of changing the parameters that may affect the results of calculations. The scope of the study includes: comparison of the results generated by the model with the solutions obtained in the life cycle net present value method (LCNPV) for time and financial input data, not burdened with the risk effect; the analysis of the variability of results due to changes in input data; analysis of the variability of results as a consequence of changing the sets of membership functions for input data and methods for defuzzification the result.

Go to article

Authors and Affiliations

E. Plebankiewicz
K. Zima
D. Wieczorek
Download PDF Download RIS Download Bibtex

Abstract

The most important challenges in the construction field is to do the experimentation of the designing at real time. It leads to the wastage of the materials and time consuming process. In this paper, an artificial neural network based model for the verification of sigma section characteristics like shear centre and deflection are designed and verified. The physical properties like weight, depth, flange, lip, outer web, thickness, and area to bring shear centre are used in the model. Similarly, weight, purlin centres with allowable loading of different values used in the model for deflection verification. The overall average error rate as 1.278 percent to the shear centre and 2.967 percent to the deflection are achieved by the model successfully. The proposed model will act as supportive tool to the steel roof constructors, engineers, and designers who are involved in construction as well as in the section fabricators industry.

Go to article

Authors and Affiliations

S. Janani
R. Thenmozhi
L.S. Jayagopal
Download PDF Download RIS Download Bibtex

Abstract

Iron production’s waste materials include significant quantities of blast furnace slag (BFS) which could potentially be used as a substitute for natural aggregates in hot mix asphalt (HMA) used in highway projects. Although many of properties of slag are interesting, its porosity and absorption rate would lead to greater consumption of asphalt. For this study, a Portland cement (PC) paste was used to reduce the porosity of a BFS. This PC treated BFS (called BFS-C) was then used in an HMA to replace the coarse fraction of a natural aggregate. Marshall, Indirect Tensile Strength (ITS), resilient modulus and Cantabro tests were then carried out on different HMA mixtures that included BFS-C. Using BFS-C, HMA’s resistance under monotonic loading, stiffness under cyclic loading, and resistance to moisture damage increased remarkably. In addition, the Cantabro abrasion resistance of BFS-C improved was better than that of the HMA mixture produced with untreated BFS.

Go to article

Authors and Affiliations

H.A. Rondón-Quintana
J.C. Ruge-Cardenas
J.G. Bastidas-Martínez
Download PDF Download RIS Download Bibtex

Abstract

The selection of the formwork system for high rise building affects the entire construction project duration and cost. The study reports the factors influencing the selection of different formwork system in the construction of high rise buildings through structural questionnaire survey from the client, contractor, consultant, and interviews with expert members. Total of 40 technical factors was identified from the literature and 220 filled questionnaires were received from the respondent. Relative Importance Index method is used to find the topmost factors affecting the selection of formwork system. Additionally, from factor analysis 22 factors were identified to have a correlation with one another. Regression analysis reveals that duration of the project, maintenance cost, adaptability, and safety have impact on formwork selection across time, cost and quality. These findings could potentially increase the construction company’s existing knowledge in relation to formwork selection.

Go to article

Authors and Affiliations

Viswanathan Rajeshkumar
V. Sreevidya

Publication Ethics Policy

ETHICS POLICY

”Archives of Civil Engineering” respects and promotes the principles of publishing ethics. Being guided by COPE’s Guidelines ( https://publicationethics.org/resources/guidelines) we ensure that all participants of the publishing process comply with these rules, the journal pays special attention to:

Editor Responsibilities
1. Qualifying individual manuscripts for publication only on the basis of: (a) compliance with the guidelines provided to the authors, (b) substantive value, (c) originality, (d) transparency of presentation
2. Deciding whether the paper fulfills all requirements i.e. formal and scientific and which articles submitted to the journal should be published. In making these decisions, the editor may be guided by the policies of the journal’s editorial board as well as by legal requirements regarding libel, copyright infringement, and plagiarism.
3. Evaluating manuscripts for intellectual content without regard to race, gender, sexual orientation, religious belief, ethnic origin, citizenship, or political philosophy of the author(s).
4. Ensuring scientific accuracy and complying with the principle of authorship; making sure that individual authors who contribute to the publication accept its form after the scientific editing
5. Providing a fair and appropriate peer review process.
6. Withdrawing manuscripts from publication, if any information about its unreliability appeared, also as a result of unintentional errors, features of plagiarism or violation of the rules of publishing ethics were identified.
7. Requiring all contributors to disclose relevant competing interests and publish corrections if competing interests are revealed after publication. If needed, other appropriate action should be taken, such as the publication of a retraction or expression of concern.
8. Maintaining the integrity of the academic record, precludes business needs from compromising intellectual and ethical standards, and is always willing to publish corrections, clarifications, retractions, and apologies when needed.
9. Not disclosing any information about a manuscript under consideration to anyone other than the author(s), reviewers and potential reviewers, and in some instances the editorial board members, as appropriate.

Reviewer Responsibilities
1. Cooperating with the scientific editor and / or editorial office and the authors in the field of improving the reviewed material;
2. Being objective and expressing the views clearly with appropriate supporting arguments.
3. Assessing of the entrusted works in a careful and objective manner, if possible with an assessment of their scientific reliability and with appropriate justification of the comments submitted;
4. identifying relevant published work that has not been cited by the authors
5. calling to the editor's attention any substantial similarity or overlap between the manuscript under consideration and any other published data of which they have personal knowledge
6. Maintaining the principle of fair play, excluding personal criticism of the author (s)
7. Maintaining confidentiality, which is not showing or discussing with others except those authorized by the editor. Any manuscripts received for review are treated as confidential documents.
8. Performing a review within the set time limit or accepting another solution jointly with ACE in the event of failure to meet this deadline.
9. Notifying the editor if the invited reviewer feels unqualified to review the manuscript or knows that its timely review will be impossible.
10. identifying relevant published work that has not been cited by the authors
11. Not considering evaluating manuscripts in which they have conflicts of interest resulting from competitive, collaborative, or other relationships or connections with any of the authors, companies, or institutions connected to the submission.

Author Responsibilities
1. Results of original research should present an accurate account of the work performed as well as an objective discussion of its significance. Underlying data should be represented accurately in the manuscript. A paper should contain sufficient detail and references to permit others to replicate the work. Fraudulent or knowingly inaccurate statements constitute unethical behaviour and are unacceptable.
2. The authors should follow the principle of originality, which is submitting only their own original works, and in the case of using the works of other authors, marking them in accordance with the rules of quotation, or obtaining consent for the publication of previously published materials from their owners or administrators;
3. An author should not in general publish manuscripts describing essentially the same research in more than one journal or primary publication. Parallel submission of the same manuscript to more than one journal constitutes unethical publishing behaviour and is unacceptable.
4. Authorship should be limited to those who have made a significant contribution to the conception, design, execution, or interpretation of the reported study and phenomena such as ghostwriting or guest authorship in the event of their detection must be actively counteracted.
5. All authors should report in a Reliable manner the sources they used to create their own study and their inclusion in the attachment bibliography;
6. All those who have made significant contributions should be listed as co-authors. Where there are others who have participated in certain substantive aspects of the research project, they should be named in an Acknowledgement section.
7. The corresponding author should ensure that all appropriate co-authors (according to the above definition) and no inappropriate co-authors are included in the author list of the manuscript, and that all co-authors have seen and approved the final version of the paper and have agreed to its submission for publication.
8. All authors should disclose in their manuscript any financial or other substantive conflict of interest that might be construed to influence the results or their interpretation in the manuscript. All sources of financial support for the project should be disclosed.
9. When an author discovers a significant error or inaccuracy in his/her own published work, it is the author’s obligation to promptly notify the journal’s editor or publisher and cooperate with them to either retract the paper or to publish an appropriate erratum.

Publisher’s Confirmation
In cases of alleged or proven scientific misconduct, fraudulent publication or plagiarism the publisher, in close collaboration with the editors, will take all appropriate measures to clarify the situation and to amend the article in question. This includes the prompt publication of an erratum or, in the most severe cases, the complete retraction of the affected work.

Peer-review Procedure

Manuscript Peer-Review Procedure

”Archives of Civil Engineering” makes sure to provide transparent policies for peer-review, and reviewers have an obligation to conduct reviews in an ethical and accountable manner. There is clear communication between the journal and the reviewers which facilitates consistent, fair, and timely review.

-The model of peer-review is double-blind: the reviewers do not know the names of the authors, and the authors do not know who reviewed their manuscript (but if the research is published reviewers can eventually know the names of the authors). A complete list of reviewers is published in a traditional version of the journal: in-print.
-It is the editor who appoints two reviewers; however, if there are discrepancies in the assessment the third reviewer can be appointed.
-After having accepted to review the manuscript (one-week deadline), the reviewers have approximately 6 weeks to finish the process.
-The paper is published in ACE provided that the reviews are positive. All manuscripts receive grades from 1-5, 5 being positive, 1 negative, the authors receive reviews to read and consider the comments.
-Manuscript evaluations are assigned one of five outcomes: accept without changes, accept after changes suggested by the reviewer, rate manuscript once again after major changes and another review, reject, withdraw.
-Manuscripts requiring minor revision (accept after changes suggested by the reviewer) does not require a second review. All manuscripts receiving a "Rate manuscript once again after major changes and another review " evaluation must be subjected to a second review. Rejected manuscripts are given no further consideration. There are cases when the article can be withdrawn, often upon the request of an author, technical reason (e.g. names of authors are placed in the text, lack of references, or inappropriate structure of the text), or plagiarism.
-The revised version of the manuscript should be uploaded to the Editorial System within six weeks. If the author(s) failed to make satisfactory changes, the manuscript is rejected.
-On acceptance, manuscripts are subject to editorial amendment to suit house style.
-Paper publication requires the author's final approval.
- As soon as the publication appears in print and in electronic forms on the Internet there is no possibility to change the content of the article.

Editor’s responsibilities
-The editor decides whether the paper fulfills all requirements i.e. formal and scientific and which articles submitted to the journal should be published.
-In making these decisions, the editor may be guided by the policies of the journal’s editorial board as well as by legal requirements regarding libel, copyright infringement, and plagiarism.
-The editor maintains the integrity of the academic record, precludes business needs from compromising intellectual and ethical standards, and is always willing to publish corrections, clarifications, retractions, and apologies when needed.
-The editor evaluates manuscripts for intellectual content without regard to race, gender, sexual orientation, religious belief, ethnic origin, citizenship, or political philosophy of the author(s).
-The editor does not disclose any information about a manuscript under consideration to anyone other than the author(s), reviewers and potential reviewers, and in some instances the editorial board members, as appropriate.

Reviewers' responsibilities
Any manuscripts received for review are treated as confidential documents. They must not be shown to or discussed with others except if authorized by the editor. Privileged information or ideas obtained through peer review is kept confidential and not used for personal advantage Any invited reviewer who feels unqualified to review the manuscript or knows that its timely review will be impossible should immediately notify the editor so that alternative reviewers can be contacted. Reviewers should identify relevant published work that has not been cited by the authors. Any statement that an observation, derivation, or argument had been previously reported should be accompanied by the relevant citation. A reviewer should also call to the editor's attention any substantial similarity or overlap between the manuscript under consideration and any other published data of which they have personal knowledge. Reviewers should not consider evaluating manuscripts in which they have conflicts of interest resulting from competitive, collaborative, or other relationships or connections with any of the authors, companies, or institutions connected to the submission. Reviews should be conducted objectively. Personal criticism of the author is unacceptable. Referees should express their views clearly with appropriate supporting arguments. All reviews must be carried out on a special form available in the Editorial System.

This page uses 'cookies'. Learn more