Applied sciences

Zeszyty Naukowe Instytutu Gospodarki Surowcami Mineralnymi Polskiej Akademii Nauk

Content

Zeszyty Naukowe Instytutu Gospodarki Surowcami Mineralnymi Polskiej Akademii Nauk | 2017 | Nr 99

Download PDF Download RIS Download Bibtex

Abstract

The problem of research undertaken in the article concerns the adaptation of traditional models of calculating the cost of capital to the specifics of mining companies. Solutions known from the literature do not give reasonable results. This is due to the uniqueness of the activities of mining companies, in which case we are dealing with a lack of reference to the typical market situations. The aim of this article is to identify solutions that allow rational and reliable results to be obtained. One of the proposals is a modified Fama-French method. The article was tested by calculating the cost of capital in the largest Polish mining enterprises. The problem of calculation of the cost of capital is particularly important in the area of assessing the effectiveness of investment projects. The cost of capital is used as the discount rate in dynamic measures of performance, such as NPV.

Go to article

Authors and Affiliations

Marian Turek
Aneta Michalak
Download PDF Download RIS Download Bibtex

Abstract

The research of development capabilities is a fundamental of strategic issues, which has to be taken into consideration by coal mines. This is particularly difficult in the current environment, which is determined by its crisis situation. In such conditions, it is necessary to take difficult decisions, and serious, strategic challenges into account, which allow for the crisis to be overcome, for the renewal and economic effectiveness of the operation of these coal mines, which have potential to grow, and closing the coal mines, which have not potential to grow. Due to the effects of such decisions, which concern not only coal mines but also the Silesian region, it is essential to prepare information to support them and promote rational choices. This is related to the issue of research for development possibilities. The article presents considerations related to the subject of research for development possibilities of coal mines in a crisis situation. Taking the results of literature study into account, the model of research process was developed, and identified the research issues concerning the following:

- the identification of external factors which determine the possibility of development of the Polish mines and drawing a schedule of their changes in the future,

- the identification of internal factors which determine the possibility of development of the Polish mines,

- developing a way for the assessment of the development potential of the coal mines, to show appropriate strategic options and action programmes for these options,

- determining possible strategic options and corresponding schedules, appropriate for the specific nature of the mines.

The proposition of their solutions, which were obtained in the process of using the specific methods and research tools, allowed the guidelines in terms of research of development capabilities of coal mines to be presented.

Go to article

Authors and Affiliations

Jolanta Bijańska
Download PDF Download RIS Download Bibtex

Abstract

This paper presents the main dilemma of development of the Polish energy sector on the 20th anniversary of the first liberalization directive of the European Union, which created the energy market. The situation in the Polish energy sector based on fossil fuels, its transformation into lower emission one is closely connected to the process of restructuring and further development of the mining sector. On the other hand, we are witnessing the development of RES, household installations producing electricity with storage and the electrification of public transport. The investments in new, large scale fossil fuel fired power plants are very expensive and not economically proven when electricity prices are low. Until the new direction of investment in energy sector will be decided, the option of the lasting of the operating existing power units seems to be a good proposal. Is the thesis: “The energy security of Poland should be fully based on indigenous sources, generation and distribution assets, delivering electricity to end users. Ensuring competitive energy prices to the economy and households, the market should be fully open to producers and consumers, including chip electricity arising from the European single market” the right assumption for the Polish energy policy?

Go to article

Authors and Affiliations

Stanisław Tokarski
Download PDF Download RIS Download Bibtex

Abstract

The article features a systemic approach to digitalization in mining, covering the production process, supervision and management. Business continuity management of a critical infrastructure was characterized with respect to an industrial facility, i.e. a mine. The “SILESIA” Integrated Security System was described. This solution, offered by CNP EMAG, is an example of a systemic approach successfully implemented in industry. The article includes information about the development of technological hardware solutions as well as software which is able to assess the solutions developed in the SecLab Information Security Technology Development Laboratory in the EMAG Institute.

Go to article

Authors and Affiliations

Artur Kozłowski
Piotr Wojtas
Download PDF Download RIS Download Bibtex

Abstract

A mine cannot function without monitoring systems: environmental, basic mining machinery and equipment. The exploitation of ore in the mine depends heavily on properly functioning machines and mining equipment, and acceptable for the miner technical environmental conditions occurring in underground excavations. The monitoring systems of the technical environment in underground mines are primarily telemetry and gasometry systems. The first part of the article shows the typical structure of gasometry systems operating in the Polish underground mines. The existing provisions include the so-called security systems of the mining plant. The article presents a quantitative summary of the telephone exchange types and count of main telecommunication lines operating in these systems. Monitoring systems of machines and mining equipment are an essential element of the effec-tive management of the mine, because they affect the safe operation and increase time of effi-ciency equipment. The second part of the article shows selected monitoring systems of mining machinery and equipment currently used in the dispatcher rooms of mines. Attention was paid to the monitoring systems, which are only software tools as well as those in which additionally use dedicated IT solutions for these systems, hardware and measuring tools. The table shows the types of monitoring systems and technological configurations used in underground mines, preferred for them.

Go to article

Authors and Affiliations

Antoni Wojaczek
Adam Wojaczek
Download PDF Download RIS Download Bibtex

Abstract

The strength of conveyor belts splices made in mines rarely reaches full belt strength. It consists of a number of factors. The primary is the method of their construction and proper selection of ingredients. The significant impact has also has splice quality covering both keeping proper geometry matched to the belt construction and belts working conditions and adherence to the best practices in the field of technologies of their construction.Difficult conditions in underground mines and pressure on reducing conveyor downtime (avoiding production losses) is reflected by a drop in static and dynamic splices strength. This is confirmed by numerous studies of belt splices strength and fatigue life conducted in the Laboratory of Belt Conveying (LTT) within the framework of research and expert opinions commissioned by belt manufacturers and their users. The consequence of too insufficiently low belt splices strength is their low durability, decreasing reliability and, consequently, higher mining transportation costs. Belt splices are in fact the weakest link in the serial structure which form closed loops of interconnected belt sections working in series of conveyors transporting excavated material in the mine. The article presents the results of simulation analyzes analyses investigating how the increase of belt splices durability may contribute to the reduction of transportation costs in the underground mines.

Go to article

Authors and Affiliations

Mirosław Bajda
Ryszard Błażej
Leszek Jurdziak
Monika Hardygóra
Download PDF Download RIS Download Bibtex

Abstract

The paper presents the experience of using the ŁPrP, ŁPKO, ŁPSp, ŁPSpA i ŁPSp3R types of flattened supports for longwall entries in the conditions of the JSW S.A. Knurów-Szczygłowice coal mine. The article concentrates on the support solutions applied in the conditions of the mine and the results in terms of stability and usefulness of the structures of the supports. An analysis of the load bearing capacity and technological conditions has been conducted for various flattened supports solutions, with special consideration given to the ŁPSp and ŁPrPJ support sets. Comparing these two, the ŁPSp exhibits a load bearing capacity that is 21% higher while using 31% less steel mass. The experiment results allowed to determine that the ŁPSpA and ŁPSp3R support types are an advantageous solutions in case of longwall set-up rooms.

Go to article

Authors and Affiliations

Piotr Głuch
Grzegorz Michalik
Tomasz Śledź
Piotr Kleibert
Adam Ratajczak
Jarosław Sobik
Download PDF Download RIS Download Bibtex

Abstract

The paper presents the statical research tests of rod bolt made of plastic with a length of 5.5 m, which were performed in a modern laboratory test facility at the Department of Underground Mining of the University of Science and Technology. Innovative The Self-excited Acoustic System (SAS) used to measure stress changes in the bolt support was characterized. The system can be used for the non-destructive evaluation of the strain of the bolt around the excavations as well as in tunnels. The aim of the study was to compare the re-sults recorded by two different measuring systems, thanks to which it will be possible to assess the load of long bolt support by means of the non-destructive method. The speed and simplicity of measurement, access to the sensors, accuracy of measurement and reading should be kept in mind in determining the load of rock bolt support . In addition, the possibility of damage to the sensor as a re-sult of technological or natural hazards should also be taken into account. In economic conditions, the „technical - balance laws of production”, which ex-cludes the use of load sensors on each bolt must be preserved. The use of indi-vidual load sensors of rock bolt support for the boundary state, allows appro-priate protection actions of the mining crew against sudden loss of excavation stability to be taken. The paper presents two basic effects used in the ultrasonic measurement sys-tem. The first result was the existence of stable limit cycle oscillations for posi-tive feedback. This effect is called the self-excited effect. The second effect is called the elasto-acoustic effect. It means that with the change of elastic stress-es in the material bring the change of the speed of propagation of the wave. In this connection, the propagation time between measuring heads is also changed. This effect manifests itself in the change in the oscillation frequency of the self-excited system. For this reason, by measuring the frequency of self-excited oscillation, it is possible to indirectly determine the level of effort of the tested material.

Go to article

Authors and Affiliations

Krzysztof Skrzypkowski
Waldemar Korzeniowski
Krzysztof Zagórski
Krzysztof Lalik
Ireneusz Dominik
Janusz Kwaśniewski
Download PDF Download RIS Download Bibtex

Abstract

The iron ore mine owned by the state concern of Luossavaara – Kiirunavaara AB-LKAB state concern has several mining skip shaft hoists for drawing iron ore. Despite using modern systems to secure the travel of these hoists in line with the Swedish regulations, units intended for the emergency breaking of vessels must be used in the so-called free travel paths in the tower and in the shaft sump. The paper discusses the main requirements that, in accordance with the Swedish regulations as regards the operational use of mining shaft hoists, must be met by devices of this type and a solution was proposed for a structure design of the braking unit for the mining shaft hoist installed in the B-1 shaft in the Kiruna mine. The frictional braking system in the form of moving bumping beams was decided to be used in the said hoist, developed in the Cable Transport Department in the University of Science and Technology in Krakow. The action of moving bumping beams consists in these beams, placed at the beginning of free travel paths, not only braking the rushing hoist vessels but also (with the integrated units for vessel capture) performing the function of grips. They secure the vessels against falling down into the shaft after the finished braking process. The advantage of such a solution is that the structural elements: the guiding shank of the tower, the head of the vessel and the bumping beams, transfer many times lower values of dynamic forces at the time of the strike of the vessel against the moving bumping beams when compared with dynamic forces arising at the time of the hit of the vessel against the fixed bumping beams. In the process of designing moving bumping beams, braking simulation is an important stage conducted with a computer program developed in KTL AGH. This program enables the modelling of load-bearing and balance ropes as flexible elements with elastic and suppressing properties. The results of these simulations, especially in the scope of the achieved braking deceleration of the vessels, the values of braking distances and forces in the load-bearing ropes are crucial in confirming the correctness of the assumed concept of the emergency braking system. The braking units in the form of moving bumping beams have been executed by the Polish company Coal-Bud Sp. z o.o. and are now being integrated in the tower and in the shaft sump of the B-1 shaft of the Kiruna mine in Sweden.

Go to article

Authors and Affiliations

Tomasz Rokita
Download PDF Download RIS Download Bibtex

Abstract

The analysis of changes in the mechanical properties of wooden mining cribs under the influence of different types of exploitation loads is the question for which deals with many domestic and abroad research centers deal with. High The high interest in this subject results from the increase of the conducted depth exploitation, which contributes to the increase in both the vertical pres-sure and the complexity of geological – mining conditions and in- the intensification of natural hazards. Another reason is the tendency of decreasing the thickness of the exploited ores deposits. Wooden crib support is used Both both in underground ore, hard coal and salt mining is used wooden crib support. Mining cribs with various configurations are especially useful for the reinforcement of excavations workings behind the front and for further strengthen of the crossings. In particular, additional reinforcement support in the form of wooden cribs (pile supporting), which shall be left empty or filled with waste rock is applied in the ore mining in places where found extended rooms or drifts are found or in places with degraded roof conditions, applies additional reinforcement support in the form of wooden cribs (pile supporting), which shall be left empty or filled with waste rock. During underground ex-ploitation is produced waste Waste rock, which comes from the access, prepar-atory excavations and from ongoing field of exploitation is produced during underground exploitation. In the case of the underground exploitation of cop-per ore, waste rock is used to fill voids after exploitation as rock stowing. It is also used for filling mining wooden cribs, as an artificial support and for harder transportation roads. This paper presents the results of the laboratory strength tests performed on models of four-point timber cribs, built with beams set horizontally, at the ge-ometrical scale of 1:10. In the laboratory research Research wooden cribs models with size 200 × 200 × 200 mm and 100 × 100 × 100 mm were used in the laboratory. The paper describes the maximum loading capacity of the cribs consisted consisting only of beams and filled with waste rocks. In addition, a vertical and appropriate strain of cribs at maximum force was shown. On the basis of laboratory research it was found that the use of the same number of timbers and the management of waste rocks, the filling of the four-point cribs with the waste rocks allowed several times to increase its support to be increased several times.

Go to article

Authors and Affiliations

Krzysztof Skrzypkowski
Download PDF Download RIS Download Bibtex

Abstract

Methane is accompanied by most of the coal deposits. The methane hazard is excessive content of this gas in the mining excavations. This is a source of high risk security and continuity of the mine. The Piast–Ziemowit is the only non-methane mine in the Polish Mining Group. In 2015, 66,4% of the coal mined in Kompania Węglowa S.A. mines comes from methane coal seams. Methane drainage is the most effective but very costly method of combating methane hazard.The costs of prevention and eradication of methane hazard is charged to the costs of coal mining. Therefore, performance of methane drainage in the mines of the Polish Mining Group is adapted to the scale of the methane hazard. The article presents an analysis of the costs of prevention of methane hazard for mines with different absolute methane and its impact on the level of these costs.

Go to article

Authors and Affiliations

Halina Potoczek
Piotr Bojarski
Leszek Kloc
Download PDF Download RIS Download Bibtex

Abstract

With reference to the situation experienced in several Polish collieries where the risk of occurrence of gas-geodynamic phenomena is increasing and decisions to start the mining activities need to take numerous constraints associated with previous mining into account, this paper addresses certain geo-mechanical aspects of longwall mining in the zones of excavation edge interactions giving rise to major changes in the conditions of the deposit and rock strata, as a consequence of previous mining operations in adjacent coalbeds. Starting from the analytical description of displacements and stresses in the proximity of longwall mining systems, the paper summarizes the results of model tests and investiga-tions of the influence that the excavation edge has on the behavior and structural continuity of a portion of the coal body in the coalbed beneath or above an old excavation. Based on selected nonlinear functions emulating the presence of edges in the rock strata, a comparative study is carried out by investigating two opposite directions of workface advance, from the gob area towards the coal body and from the coal body towards the gobs. The discussion of the results relies on the analysis of roof deformation and the concentration factor of the vertical stress component at the workface front.

Go to article

Authors and Affiliations

Dariusz Chlebowski
Zbigniew Burtan
Jerzy Cieślik
Andrzej Zorychta
Download PDF Download RIS Download Bibtex

Abstract

Underground mining extraction causes the displacement and changes of stress fields in the surrounding rock mass. The determination of the changes is extremely important when the mining activity takes place in the proximity of post-flotation tailing ponds, which may affect the stability of the tailing dams. The deterministic modeling based on principles of continuum mechanics with the use of numerical methods, e.g. finite element method (FEM) should be used in all problems of predicting rock mass displacements and changes of stress field, particularly in cases of complex geology and complex mining methods. The accuracy of FEM solutions depends mainly on the quality of geomechanical parameters of the geological strata. The parameters, e.g. young modulus of elasticity, may require verification through a comparison with measured surface deformations using geodetic methods. This paper presents application of FEM in predicting effects of underground mining on the surface displacements in the area of the KGHM safety pillar of the tailing pond of the OUOW Żelazny Most. The area has been affected by room and pillar mining with roof bending in the years 2008-2016 and will be further exposed to room-and-pillar extraction with hydraulic filling in the years 2017–2019.

Go to article

Authors and Affiliations

Ewa Warchała
Anna Szostak-Chrzanowski
Paweł Stefanek
Download PDF Download RIS Download Bibtex

Abstract

This article concerns numerical modeling of the impact of mining operations on fault behavior, carried out on the basis of a calculation program based on the finite element method. It was assumed that the fault is a single discontinuity in the form of a vertically-oriented plane, and the conditions in which surfaces merge are defined by the right of the Coulomb friction. On the one hand, the calculations are related to the fault’s response to additional weight resulting from mining operations, and on the other, they are related to the impact that occurrences in the fault’s plane had on the immediate surroundings of the extraction center. The behavior of the fault was analyzed based on distributions in the plane of shear stress and slip, together with their range and energy dissipated due to friction. In turn, the impact of the fault on its immediate environment was analyzed based on variations in the total energy density of elasticity. The results of numerical modeling made it possible to draw conclusions concerning mining operation in the proximity of tectonic dislocations in the context of seismic hazard’s levels.

Go to article

Authors and Affiliations

Zbigniew Burtan
Dariusz Chlebowski
Jerzy Cieślik
Andrzej Zorychta

This page uses 'cookies'. Learn more